800-662-7883


Join Our Mailing List
Email:

ENVIROGUARD™ Window Installation Instructions



Rough Opening

  1. Make sure the Rough Opening is the proper size.
  2. Make sure the Sill Plate is level.

Installation

  1. Frame must be level, plumb, and square.  Side jambs and sill  MUST be shimmed to insure proper uniform
    opening for sash width and height.
  2. Side jambs MUST be shimmed at the lock rail.
  3. Check diagonally corner to corner for squareness.  Jambs should be same distance apart at all locations.
  4. Do not remove strap from unit until trim is applied.

Beginning April 22, 2010, contractors performing renovation, repair and painting projects that disturb lead-based paint in homes, child care facilities, and schools built before 1978 must be certified and must follow specific work practices to prevent lead contamination. EPA requires that firms performing renovation, repair, and painting projects that disturb lead-based paint in pre-1978 homes, child care facilities and schools be certified by EPA and that they use certified renovators who are trained by EPA-approved training providers to follow lead-safe work practices. For more information please visit http://www.epa.gov/lead/pubs/renovation.htm.

enviroguard cellular PVC double hung window installation instructions

 

 

Double Hung Window Unit Installation Instructions

For complete ENVIROGUARD double-hung window installation instructions, please download a PDF file.

 

sash replacement instructions

 

 

 

 

Replacement Sash Kit Installation Instructions

For complete ENVIROGUARD replacement sash kit installation instructions, please download a PDF file.

 

 

 

 

Sash Removal Instructions & Replacement Sash Kit
Installation Video